Generate project-specific baseline parameters for Work Package creation
1 / 10
Project
Team
Sign-Offs
WP Types
Governance
Quality
Platforms
Sequence
Constraints
Sources
1. Project Basics
Define the core project information that will be inherited by all Work Packages.
2. Project Team Leadership
Name the key project leaders. These are informational and will appear in SOP exports.
3. Required Sign-Off Roles
Superintendent and Foreman are required. Add other roles as needed for your project structure.
Optional Additional Roles
4. Work Package Types & Disciplines
Enable the WP types your project will use. Assign a discipline to each for IWP constraint checklists.
5. Governance & WP Numbering
Define how Work Packages are formatted, sized, and issued on this project.
Use ## for counter, [Sector] [Discipline] [TYPE] as variables
Hold Ctrl to select multiple
6. Quality & Inspection Strategy
Establish project-wide quality expectations that cascade to every Work Package.
7. Tracking & Commissioning Platforms
Select the tools used for construction tracking and commissioning. These can be the same or different systems.
Primary tool for WP status, progress, and reporting
Tool for system turnover, testing, and sign-offs
8. Construction Sequence
Define the major phases and logical sequence of construction work. These become predecessors in WP planning.
9. Release Gate Constraints
Constraints are readiness items that must be cleared before a WP can be issued. Start with the standard 10 (AWP Vol II), or add custom constraints per your project needs.
Standard AWP Constraints (Vol II §2.3.2)
Custom Constraints (Optional)
10. Engineering Sources & References
Link to key documents and systems that WP authors will reference (Procore drawings, IO lists, cable schedules, specifications, etc.).