bf28489954 Wave 8 exit - kitting has structure, and material moves on the record
Six of six exit criteria verified and ticked. Wave totals: 6 tasks
(T8.1-T8.6), 3 new probe suites + 1 extended (kitting 26, kitting_notify 17,
materials 17, mreq 19 - 79 new checks), one Alembic migration
(material_items), one shared component extracted (wp-list-import.js), no real
email sent anywhere on this branch.

Items: CR-009, CR-010, CR-011, CR-012, CR-013, D6, D10

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-19 12:34:02 -07:00
0dbc240900 Wave 7 prep - record the Aug 18 decisions as D1-D10 and amend the waves
Nick answered 21 questions at the wave 6 exit and 11 follow-ups. Seven answers
are new build work, three amend acceptance criteria on tasks already scheduled,
and two close questions without work. None of it had an item ID, so none of it
could be built under CLAUDE.md's first rule.

New items D1-D10 in docs/waves/decisions-2026-08-18.md. A new prefix rather than
widened CR/F/S/A/B/C numbers - those are referenced in documents outside this
repo and CLAUDE.md forbids reinterpreting them. Every D entry names the item it
amends and quotes the criterion it replaces, so a reader of R2 can see what moved.

  D1  sample data returns to the creator                    B7, S7   T7.1
  D2  QA distribution list configured in the SOP            CR-014   T7.6
  D3  side navigation and collapsible sections, not tabs    F6       T7.2
  D4  Urgent surfaces the audited override, never bypasses  CR-003/A1 T7.3
  D5  usage data moves to the admin console                 B7       T7.10 (new)
  D6  material list uploads at SOP configuration            CR-013   T8.6  (new)
  D7  archived projects readable by project admins          B3, C1   T9.8  (new)
  D8  5MB a file, 2GB a project, PDFs and images, one DB    CR-007   T7.7
  D9  Ready for QA appears in Field View                    CR-014   T7.6
  D10 email switched on and off from the admin console      CR-011/14 T7.6, T8.3

Two decisions were mine to make and are recorded as such. D3: the written F6
criterion (no view over two screen heights) and the answer (one long form with
side nav) cannot both hold, so the criterion now reads 'at rest' and sections
collapse by default - tabs hide sections a first-time author does not know exist.
D8: keeping 5MB files in the same database means every encrypted backup carries
them; splitting them out was rejected because a backup without the drawings
cannot restore, so a 2GB per-project ceiling was approved instead.

Also corrected, not amended: CLAUDE.md and IMPLEMENTATION.md X2 both cited
wp-creation-app.js:1962-1972 as the protected logged-override path that T7.3 is
forbidden to remove. Those lines are deletePackage() and clearSaved(). The path
is confirmEarlyRelease() at :1002. Both documents now name it by function so the
reference survives the T7.1 rewrite that is about to move it.

Wave 9 gains T9.9, a sweep of the nine backlog entries that name wave 9 as their
home. Left unscheduled they surface at T9.7, which has no room to fix anything.
The four colour items in it (BL-004/005/008/009) are now approved work.

T9.5's help-tip count corrected from 15 to 18 and dated: three were added during
waves 5 and 6 by tasks reusing the component as designed, each unreachable for
the same reason. Scheduling a broken component late makes every reuse cost more.

Closed without work: the free-text location migration. Every location on record
is sample data because no real list has been loaded, so there is nothing to
migrate. Recorded with the condition that invalidates it - the first real
project - so it is a decision rather than a surprise.

Items: D1 D2 D3 D4 D5 D6 D7 D8 D9 D10
Task: T7.0 (wave 7 prep)

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-18 13:29:58 -05:00
3d99d4b9d0 Import the R2 implementation spec into the repo
The plan was delivered as wp-suite-implementation-spec.zip and lived only in
Downloads, so every "read CLAUDE.md first" instruction in it pointed at a file
the repo did not have. Bring it in unchanged: CLAUDE.md, IMPLEMENTATION.md, and
docs/waves/wave-0 through wave-9 plus backlog.md.

UX-REVIEW-2026-08-14.md is committed alongside it. It is the review that
produced F1-F6, S1-S13 and the A/B/C assessments, and item IDs throughout the
wave files cite it, so it belongs under version control rather than sitting
untracked in the working tree.

No application code changes here.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>