This project includes BIM/VDC packages. Choose what this one is — it tailors the fields below and the WP types / release gates offered.
General Information
Parameters in blue are inherited from the project SOP. Fill the rest for this package.
WP number builds automatically from these scope fields + the WP type (per the SOP naming format):
from SOP types
Acumatica cost codes
Assignment & Schedule
BIM / Model Details
For BIM/VDC work packages — the model deliverable's level of detail, area, source scan, and coordination status.
Assetsi
Every work package is based on one or more assets from the Micron DB. Search by asset ID, or paste a column of IDs straight from Excel, to add each asset this package covers. The Micron DB is read-only — nothing you do here changes it.
Asset ID
Note (what this asset is / why it's in scope)
Disciplinesi
Scope & Worki
Enter the work as ordered steps — added in sequence, the way the crew performs them.
from the SOP construction sequence
Material Listi
Structured bill of materials. Feeds kitting and the delivery forecast. Unit is from the Acumatica unit list.
Qty
Unit
Description
Discipline
Material Requestsi
Qty
Unit
Description
Drawings & Attachments
Document / Drawing
Rev
Link / Note
Uploads: PDF or image, up to 5MB a file.
2) Paste the file links here, one per line:
Kitting & Material Movement (MIMO)
Options come from KIT_STATUSES (CR-009): an explicit set, never free text. A pre-CR-009 value on a saved package is kept as a legacy option.
scheduled material-move date & time
Constraints — Release Readinessi
Per AWP, a package is not released to the field until every constraint is Cleared or N/A. If a constraint reopens after release, status drops to Issue (Hold).
Constraint
Status
Comment
Quality, Inspection & Hold Points
Inherited from the SOP. A Hold Point stops work until inspection sign-off; a Witness Point is offered for inspection but work may proceed if declined.
Approvals & Sign-offs
Per the AWP IWP checklist. A package should be signed by these roles before release.
Role
Name
Date
Signed
Closeout
Completed at QC / Closed — captures as-built reality and lessons learned.
Work Package Dashboard
Status, metrics and gating across all saved work packages on this device. Reads local data now; wires to the shared SQL database in Phase 2.
Saved Work Packages
WP #
Type
Subject
Status
Ready?
Log Hold — On-Hold Constraint
Moving a package to Issue (Hold) requires logging the constraint that blocked it.
Return to the crew — QA rejection
The package goes back to In Progress. The owner and the QA group are notified, and the comment stays on the package.