# Backlog Anything noticed during implementation that is real but not in the plan goes here instead of into the current PR. `CLAUDE.md` requires this: every change traces to an item ID, so unplanned work gets logged rather than built. Add an entry, do not fix it inline. This file is reviewed at `T9.7` and feeds the next spec revision. ## Format ```markdown ### BL-001 — Short title - **Found during:** T3.2 - **Where:** path/to/file.js:120 - **What:** one or two sentences on the problem - **Why not now:** out of scope for the current wave / needs a product decision / larger than the task - **Suggested wave or follow-up:** wave 9 / next revision / needs Nick ``` ## Known follow-ups already identified in the spec These are logged from the source documents, not discovered in code. They are real but deliberately deferred. ### BL-000a — Validated P6 activity lookup - **From:** `CR-001` - **What:** `CR-001` accepts free text for the P6 Activity ID. A validated lookup against an imported P6 activity list was identified as the eventual want. - **Why not now:** the Micron schedule is actively being reworked, so importing an activity list now would import churn. - **Suggested:** next revision, once the schedule stabilizes. ### BL-000b — Field-level toggles in General Information - **From:** `CR-006` - **What:** `CR-006` toggles whole sections. General Information may need per-field toggles, since projects differ in which identifiers they use. - **Why not now:** section-level toggles cover every removal request currently on the list. - **Suggested:** next revision, if a second project needs a different field set. ### BL-000c — Estimated versus actual hours productivity factor - **From:** `CR-017` - **What:** Actual Hours is retained and rolls up. Comparing it against estimated hours would produce a productivity factor, which was the stated reason for wanting the field. - **Why not now:** estimated hours capture is not in scope this round. - **Suggested:** next revision. ### BL-000d — Attachment merge versus list on export - **From:** `CR-008` / `T9.1` - **What:** whether the PDF export merges attachments into one package or lists them separately. - **Why not now:** product decision, raised in the `T9.1` PR. - **Suggested:** needs Nick.