Define the core project information that will be inherited by all Work Packages.
2. Project Team Leadership
Name the key project leaders. These are informational and will appear in SOP exports.
Additional Team Members (optional)
3. Required Sign-Off Roles
Superintendent and Foreman are required. Add other roles as needed for your project structure.
Optional Additional Roles
4. Work Package Types
Enable the WP types your project will use. Add any special rules and the roles required to approve WO completion.
5. Governance & WP Numbering
Define how Work Packages are formatted, sized, and issued on this project.
Use ## for counter, [Sector] [TYPE] as variables
Hold Ctrl to select multiple
6. Quality & Inspection Strategy
Establish project-wide quality expectations that cascade to every Work Package.
7. Tracking & Commissioning Platforms
Select the tools used for construction tracking and commissioning. These can be the same or different systems.
8. Construction Sequence
Comes pre-sequenced with a typical install flow. Drag the โ ฟ handle to reorder steps, edit labels inline, add a QC hold gate, or remove any step.
9. Release Gate Constraints
Constraints are readiness items that must be cleared before a WP can be issued.
Standard AWP Constraints (Vol II ยง2.3.2)
Custom Constraints (Optional)
10. Engineering Sources & References
Link to key documents and systems that WP authors will reference.
๐ Work Package Creation
Complete the SOP Configuration first to enable Work Package creation. Once the SOP is finished, the full creator loads here with your project defaults pre-populated.