Work Package (IWP)
General Information
Parameters in blue are inherited from the project SOP. Fill the rest for this package.
Cannot move to Issued or beyond until all constraints are cleared.
WP number builds automatically from these scope fields + the WP type (per the SOP naming format):
from SOP types
derived from WP type · drives the readiness checklist
Acumatica cost codes
Scope & Work
Enter the work as ordered steps — added in sequence, the way the crew performs them.
The package/step (from the SOP sequence) that must finish before this work can start. Choose "None" if it has no predecessor.
Material List
Structured bill of materials. Feeds kitting and the delivery forecast. Unit is from the Acumatica unit list.
QtyUnitDescription
Drawings & Attachments
Document / DrawingRevLink / Note
Kitting & Material Movement (MIMO)
scheduled material-move date & time
Constraints — Release Readiness
Per AWP, a package is not released to the field until every constraint is Cleared or N/A. If a constraint reopens after release, status drops to Issue (Hold).
ConstraintStatusComment
Quality, Inspection & Hold Points
Inherited from the SOP. A Hold Point stops work until inspection sign-off; a Witness Point is offered for inspection but work may proceed if declined.
Approvals & Sign-offs
Per the AWP IWP checklist. A package should be signed by these roles before release.
RoleNameDateSigned
Closeout
Completed at QC / Closed — captures as-built reality and lessons learned.