T9.7 + wave 9 exit - all 65 items, reconciled
docs/reference/completion.md walks every item: the 55 from IMPLEMENTATION.md section 6 and the 10 from decisions-2026-08-18.md. For each: status, the task that delivered it, the probe that re-verifies it on every run, and every deviation from written acceptance criteria - B7's page-not-merge (measured), CR-014's email body (the no-customer-IP rule won), CR-008's merge-vs-list (recommended, not decided), F6's 2.17-vs-2.0 (BL-022), S1's residual 21 dialogs (BL-024). The four out-of-scope items are confirmed unbuilt - two of them by probes that grep for their fields on every run. Section 8's outstanding inputs are restated (the material workbook and the B100 list still have not arrived; both upload paths are ready). The follow-ups for the next revision are in one place, including three product questions raised in commit messages along the way and the acceptance criteria that turned out wrong, for calibration. One item in the whole plan is knowingly open: S13 (seed_demo sign-in), carried with a reason, and F6's last number awaits a product answer. Wave 9 exit criteria: seven of seven, ticked with their verifying probes. Items: all Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
113
docs/reference/completion.md
Normal file
113
docs/reference/completion.md
Normal file
@@ -0,0 +1,113 @@
|
||||
# Completion — the R2 plan, reconciled (T9.7, 2026-08-19)
|
||||
|
||||
All 65 items accounted for: the 55 in `IMPLEMENTATION.md` §6 and the 10 in
|
||||
`docs/waves/decisions-2026-08-18.md`. Delivery references are task ids; the
|
||||
branch is local-only by instruction (one task = one commit, ids in every
|
||||
commit message), so the commit history IS the PR trail. Verification counts
|
||||
name the probe that re-checks the item on every run.
|
||||
|
||||
## Change requests
|
||||
|
||||
| Item | Status | Delivered by | Notes / deviations |
|
||||
|---|---|---|---|
|
||||
| CR-001 | built | T6.1 (`generalinfo_check` 49) | |
|
||||
| CR-002 | built | waves 1–2, field toggles T5.7; **applied to the export at T9.1** | the Micron samples now name `costCode:false, acumaticaTask:false` |
|
||||
| CR-003 | built | T6.2 | three priorities, escalating order |
|
||||
| CR-004 | built | T6.3 (`locations_check`, `rollup_check`) | paths, not labels |
|
||||
| CR-005 | built | T5.4 | upload path; **B100 list still not supplied** (§8) |
|
||||
| CR-006 | built | T5.7 (`sections_check` 95) | hidden, never deleted — pinned |
|
||||
| CR-007 | built | T7.7 (`files_check` 36) | D8 numbers enforced server-side; offline verified against a killed server |
|
||||
| CR-008 | built | T9.1 (`export_check` 20) | **deviation raised, not decided:** merge-vs-list — recommendation is inline images + listed PDFs; merged-PDF output needs Nick |
|
||||
| CR-009 | built | T8.1 (`kitting_check`) | statuses adopted as proposed; kitting off for Micron EUV by toggle |
|
||||
| CR-010 | built | T8.2 | owner on the PACKAGE (confirmed Aug 18), account-backed, orphan-safe |
|
||||
| CR-011 | built | T8.3 (`kitting_notify_check` 17) | coalesced; T7.6 gate reused; sink-verified |
|
||||
| CR-012 | built | T8.4 | shared location lists + detail field; prints and mails |
|
||||
| CR-013 | built | T8.5 (`mreq_check` 19) | lightweight scope exactly; fences grepped |
|
||||
| CR-014 | built | T7.6 (`qa_gate_check` 40) | **deviation, stated in the commit:** the email body omits location/scope — the done-when's no-customer-IP rule outranked the Do-paragraph; fuller body needs Nick |
|
||||
| CR-015 | built | T7.3 (`hold_check` 50) | root cause stated (both halves); regression test specific to clear-last-constraint |
|
||||
| CR-016 | built | T5.7 | |
|
||||
| CR-017 | guarded | T9.2 | present, optional, rolls up; BL-023 logs the productivity factor |
|
||||
| CR-018 | built | T6.4 (`rollup_check` 63) | |
|
||||
|
||||
## Findings and structural items
|
||||
|
||||
| Item | Status | Delivered by | Notes |
|
||||
|---|---|---|---|
|
||||
| F1–F5 | built | waves 1–3 | |
|
||||
| F6 | built, one number open | T7.2 (5,399 → 1,954px) | **BL-022:** 2.17 screens vs the strict 2.0 encoding of “roughly two” — product call, check stays red |
|
||||
| S1 | built | T5.8 wizard, T7.9 creator (`creator_dialogs_check` 20) | 79 → 21 dialogs; the 21 live on surfaces no S1 task named — **BL-024** |
|
||||
| S2–S5, S9–S12 | built | waves 2–5 | |
|
||||
| S6 | built | T9.3 (`icon_check` 5) | one monochrome system, mapped in `tokens.md` |
|
||||
| S7 | built | T9.4 (`sample_check` 10) | one affordance, confirmed, fenced — verified against a real project |
|
||||
| S8 | built | T9.5 (`helptip_check` 13) | 20 badges → buttons; **closed BL-001** |
|
||||
| S13 | open | — | `seed_demo.py` still does not sign in; the smoke test does. Carried to the next revision |
|
||||
| A1 | preserved | T7.3 | `confirmEarlyRelease()` by name; async now, same contract |
|
||||
| A2 | built | T7.4 (`warning_check` 17) | one warning; the count on the sticky rail |
|
||||
| A3–A5, A7 | built | waves 1–6 | localization re-verified through T7.10's admin edits (`cards_check`) |
|
||||
| A6 | built | T7.5 (`triage_check` 16) | |
|
||||
| B1–B5 | built | waves 2–5 | |
|
||||
| B6 | built | T7.8 (`sticky_bar_check` 12) | |
|
||||
| B7 | built | T7.1 (`frame_check` 38) | **deviation, stated in the commit:** the creator became its own page rather than merging into the parent — measured trade (0 collisions vs 21+9) |
|
||||
| C1 | audited | T9.5 (`accessibility-audit.md`) | every metric probe-backed |
|
||||
| C2 | audited | T9.6 (`mobile_check` 24) | screenshots committed beside the wave 0 baseline |
|
||||
| C3 | built | wave 3 | |
|
||||
| C4 | built | wave 4 interim, T9.9 full (`color_check` 4) | zero literals outside `theme-light.css` |
|
||||
|
||||
## The August 18 decisions
|
||||
|
||||
| Item | Status | Delivered by |
|
||||
|---|---|---|
|
||||
| D1 | built | T7.1 (sample controls visible; consolidated at T9.4 per the S7 reconciliation) |
|
||||
| D2 | built | T7.6 (QA group on the SOP wizard) |
|
||||
| D3 | built | T7.2 (rail + collapse; the "at rest" amendment recorded) |
|
||||
| D4 | built | T7.3 (Urgent surfaces the audited path; the override names what it crosses) |
|
||||
| D5 | built | T7.10 (one analytics core; admin report) |
|
||||
| D6 | built | T8.6 (material list, the CR-005 pattern, one shared component) |
|
||||
| D7 | built | T9.8 (`archived_check` 15) |
|
||||
| D8 | built | T7.7 (5MB / PDF+image / 2GB, 80% warning) |
|
||||
| D9 | built | T7.6 (Field View text pill at 390px) |
|
||||
| D10 | built | T7.6 / reused T8.3 (stored setting, admin-only, audited, sink-verified) |
|
||||
|
||||
## Out of scope, confirmed unbuilt
|
||||
|
||||
- **Parts catalog / live inventory / warehouse integration** — `mreq_check` and
|
||||
`materials_check` grep the model and the diff for stock/inventory/price
|
||||
fields on every run; none exist. D6's uploaded list is project-scoped data
|
||||
entry, not a catalog.
|
||||
- **Asset database integration** — the assets section stays a CR-006 toggle
|
||||
(off on the Micron sample); no integration code exists.
|
||||
- **CxAlloy integration** — CR-014 is notification-only, as the task footnote
|
||||
ordered; the platforms block stores names and URLs, nothing calls them.
|
||||
- **P6 activity import** — CR-001 renders the two fields; nothing imports.
|
||||
|
||||
## Outstanding inputs (IMPLEMENTATION.md §8, restated)
|
||||
|
||||
- Nate's spreadsheet and the master material workbook: **still not supplied.**
|
||||
D6 built the upload path so their arrival is a paste, not a build.
|
||||
- The real B100 floor/area list: **still not supplied.** CR-005's upload is
|
||||
ready for it; every seeded value remains obviously fake.
|
||||
- SMTP host/credentials for production mail: the gate ships off; the password
|
||||
is env-only. Nothing on this branch has sent a real email.
|
||||
|
||||
## For the next revision
|
||||
|
||||
- **BL-020** — the wizard→creator navigation prompts to leave (T4.3's guard
|
||||
doing its job on what is now a page exit); product call on suppression.
|
||||
- **BL-021** — `project_sop_team()` reads a path `pushSOP` never writes; the
|
||||
critical-reopen mail has never reached the PM/CM. One line, needs its own
|
||||
sink verification.
|
||||
- **BL-022** — F6's "roughly two screens": 2.17 vs the strict 2.0. Bless it or
|
||||
name the chrome to trim.
|
||||
- **BL-023** — the productivity factor (actual ÷ estimated); data already
|
||||
aggregated, placement needs Nick.
|
||||
- **BL-024** — 21 native dialogs on admin/users/launcher; the T7.9 kit is
|
||||
ready for them.
|
||||
- **S13** — `seed_demo.py` sign-in.
|
||||
- Product questions raised in commit messages, awaiting answers: hold
|
||||
reachable from Draft/Scheduled (T7.3); CR-014 email body content (T7.6);
|
||||
merged-PDF export (T9.1).
|
||||
- Acceptance criteria that turned out wrong, for the next plan's calibration:
|
||||
F6's height bar collided with D3's own chosen design (amended once, then
|
||||
left red rather than moved again); A2's "tab count badge" predated D3
|
||||
removing tabs (the rail carried it); S1's "0 dialogs" never named the
|
||||
console pages that held a quarter of them.
|
||||