Files
Project-SDE-WP-Suite/docs/reference/completion.md
n.siegfried 454bfa0fe1 T9.7 + wave 9 exit - all 65 items, reconciled
docs/reference/completion.md walks every item: the 55 from IMPLEMENTATION.md
section 6 and the 10 from decisions-2026-08-18.md. For each: status, the task
that delivered it, the probe that re-verifies it on every run, and every
deviation from written acceptance criteria - B7's page-not-merge (measured),
CR-014's email body (the no-customer-IP rule won), CR-008's merge-vs-list
(recommended, not decided), F6's 2.17-vs-2.0 (BL-022), S1's residual 21
dialogs (BL-024).

The four out-of-scope items are confirmed unbuilt - two of them by probes
that grep for their fields on every run. Section 8's outstanding inputs are
restated (the material workbook and the B100 list still have not arrived;
both upload paths are ready). The follow-ups for the next revision are in one
place, including three product questions raised in commit messages along the
way and the acceptance criteria that turned out wrong, for calibration.

One item in the whole plan is knowingly open: S13 (seed_demo sign-in),
carried with a reason, and F6's last number awaits a product answer.

Wave 9 exit criteria: seven of seven, ticked with their verifying probes.

Items: all

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-19 14:29:29 -07:00

7.1 KiB
Raw Blame History

Completion — the R2 plan, reconciled (T9.7, 2026-08-19)

All 65 items accounted for: the 55 in IMPLEMENTATION.md §6 and the 10 in docs/waves/decisions-2026-08-18.md. Delivery references are task ids; the branch is local-only by instruction (one task = one commit, ids in every commit message), so the commit history IS the PR trail. Verification counts name the probe that re-checks the item on every run.

Change requests

Item Status Delivered by Notes / deviations
CR-001 built T6.1 (generalinfo_check 49)
CR-002 built waves 12, field toggles T5.7; applied to the export at T9.1 the Micron samples now name costCode:false, acumaticaTask:false
CR-003 built T6.2 three priorities, escalating order
CR-004 built T6.3 (locations_check, rollup_check) paths, not labels
CR-005 built T5.4 upload path; B100 list still not supplied (§8)
CR-006 built T5.7 (sections_check 95) hidden, never deleted — pinned
CR-007 built T7.7 (files_check 36) D8 numbers enforced server-side; offline verified against a killed server
CR-008 built T9.1 (export_check 20) deviation raised, not decided: merge-vs-list — recommendation is inline images + listed PDFs; merged-PDF output needs Nick
CR-009 built T8.1 (kitting_check) statuses adopted as proposed; kitting off for Micron EUV by toggle
CR-010 built T8.2 owner on the PACKAGE (confirmed Aug 18), account-backed, orphan-safe
CR-011 built T8.3 (kitting_notify_check 17) coalesced; T7.6 gate reused; sink-verified
CR-012 built T8.4 shared location lists + detail field; prints and mails
CR-013 built T8.5 (mreq_check 19) lightweight scope exactly; fences grepped
CR-014 built T7.6 (qa_gate_check 40) deviation, stated in the commit: the email body omits location/scope — the done-when's no-customer-IP rule outranked the Do-paragraph; fuller body needs Nick
CR-015 built T7.3 (hold_check 50) root cause stated (both halves); regression test specific to clear-last-constraint
CR-016 built T5.7
CR-017 guarded T9.2 present, optional, rolls up; BL-023 logs the productivity factor
CR-018 built T6.4 (rollup_check 63)

Findings and structural items

Item Status Delivered by Notes
F1F5 built waves 13
F6 built, one number open T7.2 (5,399 → 1,954px) BL-022: 2.17 screens vs the strict 2.0 encoding of “roughly two” — product call, check stays red
S1 built T5.8 wizard, T7.9 creator (creator_dialogs_check 20) 79 → 21 dialogs; the 21 live on surfaces no S1 task named — BL-024
S2S5, S9S12 built waves 25
S6 built T9.3 (icon_check 5) one monochrome system, mapped in tokens.md
S7 built T9.4 (sample_check 10) one affordance, confirmed, fenced — verified against a real project
S8 built T9.5 (helptip_check 13) 20 badges → buttons; closed BL-001
S13 open seed_demo.py still does not sign in; the smoke test does. Carried to the next revision
A1 preserved T7.3 confirmEarlyRelease() by name; async now, same contract
A2 built T7.4 (warning_check 17) one warning; the count on the sticky rail
A3A5, A7 built waves 16 localization re-verified through T7.10's admin edits (cards_check)
A6 built T7.5 (triage_check 16)
B1B5 built waves 25
B6 built T7.8 (sticky_bar_check 12)
B7 built T7.1 (frame_check 38) deviation, stated in the commit: the creator became its own page rather than merging into the parent — measured trade (0 collisions vs 21+9)
C1 audited T9.5 (accessibility-audit.md) every metric probe-backed
C2 audited T9.6 (mobile_check 24) screenshots committed beside the wave 0 baseline
C3 built wave 3
C4 built wave 4 interim, T9.9 full (color_check 4) zero literals outside theme-light.css

The August 18 decisions

Item Status Delivered by
D1 built T7.1 (sample controls visible; consolidated at T9.4 per the S7 reconciliation)
D2 built T7.6 (QA group on the SOP wizard)
D3 built T7.2 (rail + collapse; the "at rest" amendment recorded)
D4 built T7.3 (Urgent surfaces the audited path; the override names what it crosses)
D5 built T7.10 (one analytics core; admin report)
D6 built T8.6 (material list, the CR-005 pattern, one shared component)
D7 built T9.8 (archived_check 15)
D8 built T7.7 (5MB / PDF+image / 2GB, 80% warning)
D9 built T7.6 (Field View text pill at 390px)
D10 built T7.6 / reused T8.3 (stored setting, admin-only, audited, sink-verified)

Out of scope, confirmed unbuilt

  • Parts catalog / live inventory / warehouse integrationmreq_check and materials_check grep the model and the diff for stock/inventory/price fields on every run; none exist. D6's uploaded list is project-scoped data entry, not a catalog.
  • Asset database integration — the assets section stays a CR-006 toggle (off on the Micron sample); no integration code exists.
  • CxAlloy integration — CR-014 is notification-only, as the task footnote ordered; the platforms block stores names and URLs, nothing calls them.
  • P6 activity import — CR-001 renders the two fields; nothing imports.

Outstanding inputs (IMPLEMENTATION.md §8, restated)

  • Nate's spreadsheet and the master material workbook: still not supplied. D6 built the upload path so their arrival is a paste, not a build.
  • The real B100 floor/area list: still not supplied. CR-005's upload is ready for it; every seeded value remains obviously fake.
  • SMTP host/credentials for production mail: the gate ships off; the password is env-only. Nothing on this branch has sent a real email.

For the next revision

  • BL-020 — the wizard→creator navigation prompts to leave (T4.3's guard doing its job on what is now a page exit); product call on suppression.
  • BL-021project_sop_team() reads a path pushSOP never writes; the critical-reopen mail has never reached the PM/CM. One line, needs its own sink verification.
  • BL-022 — F6's "roughly two screens": 2.17 vs the strict 2.0. Bless it or name the chrome to trim.
  • BL-023 — the productivity factor (actual ÷ estimated); data already aggregated, placement needs Nick.
  • BL-024 — 21 native dialogs on admin/users/launcher; the T7.9 kit is ready for them.
  • S13seed_demo.py sign-in.
  • Product questions raised in commit messages, awaiting answers: hold reachable from Draft/Scheduled (T7.3); CR-014 email body content (T7.6); merged-PDF export (T9.1).
  • Acceptance criteria that turned out wrong, for the next plan's calibration: F6's height bar collided with D3's own chosen design (amended once, then left red rather than moved again); A2's "tab count badge" predated D3 removing tabs (the rail carried it); S1's "0 dialogs" never named the console pages that held a quarter of them.