0dbc2409006cc67c7dd50232823d51c19c1a1d05
Nick answered 21 questions at the wave 6 exit and 11 follow-ups. Seven answers are new build work, three amend acceptance criteria on tasks already scheduled, and two close questions without work. None of it had an item ID, so none of it could be built under CLAUDE.md's first rule. New items D1-D10 in docs/waves/decisions-2026-08-18.md. A new prefix rather than widened CR/F/S/A/B/C numbers - those are referenced in documents outside this repo and CLAUDE.md forbids reinterpreting them. Every D entry names the item it amends and quotes the criterion it replaces, so a reader of R2 can see what moved. D1 sample data returns to the creator B7, S7 T7.1 D2 QA distribution list configured in the SOP CR-014 T7.6 D3 side navigation and collapsible sections, not tabs F6 T7.2 D4 Urgent surfaces the audited override, never bypasses CR-003/A1 T7.3 D5 usage data moves to the admin console B7 T7.10 (new) D6 material list uploads at SOP configuration CR-013 T8.6 (new) D7 archived projects readable by project admins B3, C1 T9.8 (new) D8 5MB a file, 2GB a project, PDFs and images, one DB CR-007 T7.7 D9 Ready for QA appears in Field View CR-014 T7.6 D10 email switched on and off from the admin console CR-011/14 T7.6, T8.3 Two decisions were mine to make and are recorded as such. D3: the written F6 criterion (no view over two screen heights) and the answer (one long form with side nav) cannot both hold, so the criterion now reads 'at rest' and sections collapse by default - tabs hide sections a first-time author does not know exist. D8: keeping 5MB files in the same database means every encrypted backup carries them; splitting them out was rejected because a backup without the drawings cannot restore, so a 2GB per-project ceiling was approved instead. Also corrected, not amended: CLAUDE.md and IMPLEMENTATION.md X2 both cited wp-creation-app.js:1962-1972 as the protected logged-override path that T7.3 is forbidden to remove. Those lines are deletePackage() and clearSaved(). The path is confirmEarlyRelease() at :1002. Both documents now name it by function so the reference survives the T7.1 rewrite that is about to move it. Wave 9 gains T9.9, a sweep of the nine backlog entries that name wave 9 as their home. Left unscheduled they surface at T9.7, which has no room to fix anything. The four colour items in it (BL-004/005/008/009) are now approved work. T9.5's help-tip count corrected from 15 to 18 and dated: three were added during waves 5 and 6 by tasks reusing the component as designed, each unreachable for the same reason. Scheduling a broken component late makes every reuse cost more. Closed without work: the free-text location migration. Every location on record is sample data because no real list has been loaded, so there is nothing to migrate. Recorded with the condition that invalidates it - the first real project - so it is a decision rather than a surprise. Items: D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 Task: T7.0 (wave 7 prep) Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Description
No description provided
Languages
Python
49.3%
JavaScript
32.6%
CSS
8.9%
HTML
8.7%
Shell
0.4%