n.siegfried 566ace9969 Add BIM/VDC work packages, platform links, and AWP traceability
SOP tool:
- "Load BIM / VDC template" (Step 4): one click sets BIM deliverable
  types, install-phase disciplines, BIM release-gate constraints (with
  EN06 citations), the BIM process sequence, reference sources, BIM
  sign-off roles, and MWP##-[Area]-[PHASE] numbering. Tags the SOP mode
  as 'bim'.
- Step 3 required sign-off role titles are now editable (default
  Superintendent/Foreman); the BIM template sets them to BIM Coordinator
  and Construction Lead (CRS).
- Step 7: capture a project-homepage link for the chosen tracking and
  commissioning platforms.

Work Package Creator:
- BIM mode (SOP.mode==='bim'): hides controls.dev Assets, Material List,
  and Kitting/MIMO; shows a BIM Details card (LOD, model area, clash /
  coordination status, linked scan).
- Project tracking/commissioning links are copied onto every WP and
  shown in the WP output.
- "Enabled by - BIM package(s)" field links a field IWP back to the BIM
  package that enabled it (EWP -> IWP traceability).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-30 14:54:57 -07:00
..