566ace9969e48ddedf30b061ff119c02a8da1602
SOP tool: - "Load BIM / VDC template" (Step 4): one click sets BIM deliverable types, install-phase disciplines, BIM release-gate constraints (with EN06 citations), the BIM process sequence, reference sources, BIM sign-off roles, and MWP##-[Area]-[PHASE] numbering. Tags the SOP mode as 'bim'. - Step 3 required sign-off role titles are now editable (default Superintendent/Foreman); the BIM template sets them to BIM Coordinator and Construction Lead (CRS). - Step 7: capture a project-homepage link for the chosen tracking and commissioning platforms. Work Package Creator: - BIM mode (SOP.mode==='bim'): hides controls.dev Assets, Material List, and Kitting/MIMO; shows a BIM Details card (LOD, model area, clash / coordination status, linked scan). - Project tracking/commissioning links are copied onto every WP and shown in the WP output. - "Enabled by - BIM package(s)" field links a field IWP back to the BIM package that enabled it (EWP -> IWP traceability). Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Description
No description provided
Languages
Python
49.3%
JavaScript
32.6%
CSS
8.9%
HTML
8.7%
Shell
0.4%