n.siegfried ca4176ac00 Sequence: BIM steps first, and default flow matches the field spec
- enableBIM() prepends the BIM steps (BIM precedes construction) instead
  of appending them.
- Default construction sequence updated to the agreed flow (2D sheets /
  spool drawings -> conduit -> tray -> QC hold -> wire pull -> device ->
  termination -> QC hold -> commissioning -> as-built), with QC-hold gates.
- Sample project now enables BIM/VDC so it demonstrates the full
  BIM -> construction sequence.