- enableBIM() prepends the BIM steps (BIM precedes construction) instead of appending them. - Default construction sequence updated to the agreed flow (2D sheets / spool drawings -> conduit -> tray -> QC hold -> wire pull -> device -> termination -> QC hold -> commissioning -> as-built), with QC-hold gates. - Sample project now enables BIM/VDC so it demonstrates the full BIM -> construction sequence. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>