The plan was delivered as wp-suite-implementation-spec.zip and lived only in Downloads, so every "read CLAUDE.md first" instruction in it pointed at a file the repo did not have. Bring it in unchanged: CLAUDE.md, IMPLEMENTATION.md, and docs/waves/wave-0 through wave-9 plus backlog.md. UX-REVIEW-2026-08-14.md is committed alongside it. It is the review that produced F1-F6, S1-S13 and the A/B/C assessments, and item IDs throughout the wave files cite it, so it belongs under version control rather than sitting untracked in the working tree. No application code changes here. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2.2 KiB
2.2 KiB
Backlog
Anything noticed during implementation that is real but not in the plan goes here instead of
into the current PR. CLAUDE.md requires this: every change traces to an item ID, so
unplanned work gets logged rather than built.
Add an entry, do not fix it inline. This file is reviewed at T9.7 and feeds the next spec
revision.
Format
### BL-001 — Short title
- **Found during:** T3.2
- **Where:** path/to/file.js:120
- **What:** one or two sentences on the problem
- **Why not now:** out of scope for the current wave / needs a product decision / larger than the task
- **Suggested wave or follow-up:** wave 9 / next revision / needs Nick
Known follow-ups already identified in the spec
These are logged from the source documents, not discovered in code. They are real but deliberately deferred.
BL-000a — Validated P6 activity lookup
- From:
CR-001 - What:
CR-001accepts free text for the P6 Activity ID. A validated lookup against an imported P6 activity list was identified as the eventual want. - Why not now: the Micron schedule is actively being reworked, so importing an activity list now would import churn.
- Suggested: next revision, once the schedule stabilizes.
BL-000b — Field-level toggles in General Information
- From:
CR-006 - What:
CR-006toggles whole sections. General Information may need per-field toggles, since projects differ in which identifiers they use. - Why not now: section-level toggles cover every removal request currently on the list.
- Suggested: next revision, if a second project needs a different field set.
BL-000c — Estimated versus actual hours productivity factor
- From:
CR-017 - What: Actual Hours is retained and rolls up. Comparing it against estimated hours would produce a productivity factor, which was the stated reason for wanting the field.
- Why not now: estimated hours capture is not in scope this round.
- Suggested: next revision.
BL-000d — Attachment merge versus list on export
- From:
CR-008/T9.1 - What: whether the PDF export merges attachments into one package or lists them separately.
- Why not now: product decision, raised in the
T9.1PR. - Suggested: needs Nick.